Module guide: Bridge Concept3D / SchémaConcept

This module does not work on its own: its only purpose is to bridge Concept3D and SchémaConcept, both of which must be installed. Non-technical user guide: what the module is for, how to use it and how it fits with Dolibarr.

From plan to electrical fileNeeds are derived from the plan, room by room, each one explained
Both waysTo SchémaConcept, then the additions come back into the Concept3D plan
9 country profilesSizing aids, to be validated by a professional
One quoteLayout and electrical work merged, layout plan attached

1. Module overview

The Bridge Concept3D / SchémaConcept (technical name: pontcao, version 1.0.3) links a Concept3D plan and a SchémaConcept schematic, in both directions. The kitchen, bathroom or interior designer draws the room; the bridge derives the electrical needs room by room, explains each of them, then hands SchémaConcept the schematic, the distribution board, the single-line diagram and the installation sheet. The electrician completes the work; the additions come back into the plan. Nothing is written in either module without a preview first.

  • No separate menu: the bridge entries sit in the Concept3D menu (“Electrical links”) and in the SchémaConcept menu (“Layout links”).
  • An “Electrical” tab on the card of a Concept3D plan and a “Layout” tab on the card of a SchémaConcept schematic.
  • A link card with eight tabs: “Link”, “Plan analysis”, “Layout plan”, “Coverage”, “Synchronisation”, “Quotes”, “Report”, “Log”.
  • Nine standards profiles by country, editable mappings between the objects of the plan and the electrical points, and a product classification shared by Concept3D, SchémaConcept and the bridge.
  • Internal tool: external accounts (customers) have no access to any screen of the bridge.

2. Compatibility and requirements

What you need before installing.

  • Version 1.0.3, for Dolibarr 18 to 24, with PHP 8.1 or later.
  • Databases: MySQL / MariaDB, PostgreSQL 16 and PostgreSQL 18.
  • Concept3D and SchémaConcept, sold separately, must be installed and enabled: without them the bridge analyses nothing and writes nothing, only its setup remains available.
  • Native Dolibarr modules: Third parties and Products (required on activation), Proposals for merging quotes, Projects to file the quotes in a project, Categories for the product classification.
  • Five interface languages: French, English, German, Spanish, Italian.

3. Installation and activation

A few minutes, with no mandatory setting.

  • Install the ZIP file from the Dolibarr modules page (deployment of an external module), or copy the module folder into the “custom” directory.
  • Enable “Bridge Concept3D / SchémaConcept” in the list of modules, once Concept3D and SchémaConcept are enabled.
  • On activation, the bridge creates its tables, the nine standards profiles, and the delivered mappings and room rules; no Concept3D or SchémaConcept data is changed.
  • Give the bridge permissions to the relevant users, then open the setup: the “Linked modules ready” card must show 2 / 2.
  • After updating the module, disable it and enable it again: its menus and tabs are rewritten on activation.

4. Permissions

Five permissions, combined with those of Concept3D, SchémaConcept and proposals.

  • “Read links, installation plans and reports”: open the links, all their tabs, the standards profiles and the downloads.
  • “Create a link and run an analysis”: create and edit a link, archive or reactivate it, save rooms and options, move a point, handle a gap.
  • “Apply a link in Concept3D and SchémaConcept”: write in SchémaConcept or in Concept3D and merge quotes; the create permission of the target module is also required.
  • “Delete or archive a link”: delete a link; archiving and reactivating are done with the previous permission.
  • “Configure mappings, country standards and rules”: mappings, room rules, optics, standards profiles, product classification, reference prefix. Validating a profile remains reserved to the Dolibarr administrator.
  • External accounts are refused everywhere, whatever their permissions. The consolidated margin of a quote is only shown to an administrator or to a user allowed to see margins in both Concept3D and SchémaConcept.

5. Where to find the bridge in Dolibarr

The bridge fits into the screens of the two linked modules.

  • Concept3D menu, group “Electrical links”; SchémaConcept menu, group “Layout links”. The group title opens the dashboard; below it: “Links”, “New link”, “Country standards”, “Setup”.
  • Card of a Concept3D plan: “Electrical” tab, listing the links of the plan, and button “Link to an electrical schematic” or, when a link already exists, “Layout ↔ electrical link”.
  • Card of a SchémaConcept schematic: “Layout” tab and button “Link to a layout plan” or “Layout ↔ electrical link”.
  • Concept3D 3D view: a checkbox displays the electrical points of the link on top of the layout.
  • SchémaConcept editor: a button opens the layout plan of the link.
  • Card of a linked quote: a block recalls the link, the associated quote and the consolidated total.

6. The full journey, from the plan to the electrical file

The steps, in order.

  • 1. Draw the plan in Concept3D: walls, openings, furniture, appliances.
  • 2. Create the link from the “Electrical” tab of the plan or with “New link”: choose the plan, an existing schematic if any, and the standards profile.
  • 3. “Plan analysis” tab: confirm the type of each room, tick the options, read the needs and the reason for each.
  • 4. “To SchémaConcept” section: read the preview, then click “Apply in SchémaConcept”; the schematic, the board, the single-line diagram and the installation sheet are created.
  • 5. The electrician completes the work in SchémaConcept; the symbols added on the installation sheet are placed in the plan with “Place in the plan”.
  • 6. “Synchronisation” tab: after any change to the plan or the schematic, handle the gaps and apply again.
  • 7. “Quotes” tab: merge the layout quote and the electrical quote, attach the layout plan.
  • 8. “Report” and “Layout plan” tabs: download the report, the mappings and the layout plan; together they form the electrical file of the job.

7. The dashboard and the list of links

The entry point to follow the linked jobs.

  • The dashboard (“Layout ↔ electrical bridge”) shows six indicators: “Links”, “Out of sync”, “Conflicts”, “Installation points”, “Profiles to validate”, “Operations this month”.
  • The “Activity over twelve months” chart plots the links created and the operations; the last ten links are listed below.
  • The list of links can be filtered by reference, label, third party and status, sorted by column and paged.
  • Statuses of a link: “Draft”, “Synchronised”, “Out of sync”, “In conflict”, “Frozen”, “Archived”.

8. The card of a link

“Link” tab: the identity of the link and its life cycle.

  • Creation: a label, a plan, a schematic or both, a standards profile (“Automatic (third party country)” by default) and a note. The third party and the project are taken from the plan or the schematic; if each has a third party, it must be the same one.
  • A plan or a schematic already carried by an active link cannot receive a second one. Nothing is written in Concept3D or SchémaConcept on creation.
  • The reference is assigned automatically: prefix, year and month, sequence number (example: PCL2611-0001).
  • The card shows the third party, the plan, the schematic, the profile used and the reason for that choice, the date of the last synchronisation and five indicators: “Installation points”, “Circuits”, “Orphans”, “Conflicts”, “Rules not filled in”.
  • Buttons: modify, “Open plan”, “Open schematic”, “Archive” or “Reactivate”, delete.
  • Deleting a link removes its points and its links; the plan, the schematic, the quotes and the log are kept.
  • The linked objects block shows the plan and the schematic; the link appears in theirs in return.

9. The “Plan analysis” tab

A reading of the plan: the analysis changes nothing.

  • Six indicators: “Rooms”, “Points”, “Circuits”, “Subscription” (installed and diversified power), “Main breaker”, “Warnings”.
  • Rooms: each room detected on the plan receives a type (kitchen, living room, bedroom, bathroom…). The type comes from your choice, from the marker placed on the plan, from the profile of the plan, or from a default value to be confirmed.
  • Options: “Intrusion alarm”, “Supply” (“Single-phase” or “Three-phase”), “Dedicated appliances” (list provided by SchémaConcept), surge protection device and contactor. The “Save rooms and options” button stores them on the link.
  • “Electrical needs” table: for each point, its kind (socket, worktop socket, dedicated socket, cable outlet, lighting point, switch, RJ45 socket, TV socket, detectors, camera…), its symbol, its height and the “Why this point” column.
  • The origin of each need is shown: “Plan object”, “Room rule”, “Kitchen rule”, “Bathroom rule”, “Network rule”, “Alarm rule”.
  • Kitchen: worktop sockets follow the profile. The distances to keep around the sink and the hob are not filled in the delivered profiles; they apply as soon as you enter them in a personal profile.
  • Bathroom: the zones around the bath and the shower are calculated according to the profile (they are not drawn on the plan); a point placed in a zone where it does not belong is reported, with the expected protection rating when the profile provides it.
  • Roller shutters are counted per room; circuits, subscription and power balance are calculated by SchémaConcept.

10. To SchémaConcept: preview, then application

“To SchémaConcept” section of the analysis tab.

  • The preview states, element by element, what will be done: “Schematic” (created or used), “Link switchboard” (created or completed, nothing is deleted), “Single-line diagram”, “Layout sheet”, and the components to create, to update, to remove or unchanged.
  • “Apply in SchémaConcept” only writes what the preview states. If the plan or the schematic has changed in the meantime, the application is refused: the preview must be read again.
  • The schematic created is a draft, attached to the third party of the link, with its standards profile.
  • The components placed by the bridge are marked; those you placed yourself in SchémaConcept are never changed.
  • Running it again after a change to the plan updates without duplicates: only the components added, moved or no longer needed change.
  • The apply permission of the bridge and the create permission in SchémaConcept are required. A validated schematic must be reopened before a new application.
  • The bridge does not choose the products of the components: pricing is done in SchémaConcept.

11. To Concept3D: the way back

“To Concept3D” section of the analysis tab.

  • The symbols added by the electrician on the installation sheet (detector, camera, socket…) are listed with the matching Concept3D equipment.
  • “Place in the plan” adds this equipment to the plan, without overlap; nothing else is changed in it.
  • States shown line by line: “To place in the plan”, “Already placed in the plan”, “Outside the plan frame: not placed”, “No Concept3D device matches this symbol”, “No product for sale carries this device”.
  • The apply permission of the bridge and the create permission in Concept3D are required. A plan already converted into a quote is never changed.

12. The “Layout plan” tab

The electrical plan of the job, to scale.

  • Plan at 1:50 scale (1 m = 20 mm): rooms, walls, openings and numbered points, with the legend.
  • Layers by domain, which can be shown one by one: “Sockets and power”, “Lighting”, “Network”, “Audiovisual”, “Alarm and access”, “Video”, “Fire”, “Heating and cooling”.
  • The plan imported into Concept3D can be displayed in the background (“Imported plan as background”).
  • Drag a point to move it: it snaps to the nearest wall (60 cm). The move is stored and the link becomes “Out of sync”; a button cancels the moves.
  • Points avoid windows, doors and French windows (except opening contacts and ceiling points); a point left without a free place is reported.
  • Buttons “Download as SVG” and “Download as PDF”.

13. The “Coverage” tab

What the detectors and cameras see.

  • “Alarm coverage” and “Video coverage”: the sector of each motion detector and each camera (angle and range), stopped by the walls.
  • In red: the areas seen by no equipment and the exterior openings with neither contact nor detector.
  • “Exterior openings” table (exterior door, French window, window): contact, seen by a detector, “Protected” or “Not protected”.
  • Angles and ranges are set in the setup, “Optics” tab. The calculation is indicative.

14. The “Synchronisation” tab

Follow the gaps between the plan and the schematic since the last application.

  • States: “Never applied”, “Synchronised”, “To resynchronise”, “In conflict”, “Frozen”, “Archived”.
  • Any change to the plan in Concept3D or to the schematic in SchémaConcept automatically marks the link “To resynchronise”; the real gap is recalculated when the tab is opened.
  • The “What to do now?” box gives the next step according to the state; “How synchronisation works” recalls the principle in four steps.
  • “Plan-side differences”: new point, missing point, moved point, plan changed with no effect on the electrical side. “SchémaConcept-side differences”: component deleted, moved, symbol changed, board changed, symbol added to be placed in the plan.
  • Resolutions, line by line: “Apply to SchémaConcept”, “Place in the plan”, “Keep the SchémaConcept position”, “Accept the deletion”, “Detach”, “Ignore” (and “Stop ignoring”).
  • “In conflict”: the plan and the schematic have both changed; you choose line by line which version to keep.
  • “Frozen”: the plan is converted into a quote or the schematic can no longer be edited; nothing is written until the cause is removed.
  • Synchronisation is manual: nothing is written without a preview.

15. The “Quotes” tab and the merge

One quote for the customer.

  • The layout quote, created from the plan, and the electrical quote, created from the schematic, are found automatically, with their “Consolidated total”.
  • “Merge the quotes”, after a preview of the copied lines and a check of the totals, in two modes: “New quote” (a draft takes the lines of both quotes, which remain untouched) or “Add to the layout quote”.
  • Each part keeps its title (layout, electrical); the title and subtotal settings of your quotes are respected.
  • The quotes are filed in the project of the link; if there is none and the Projects module is enabled, a project is created on merge.
  • “Attach the installation plan” puts the PDF of the layout plan in the documents of the quote.
  • The apply permission of the bridge and the permission to create proposals are required; the merge needs a layout quote and an electrical quote.

16. The “Report” tab and the downloads

The summary of the link, on screen and as files.

  • “Summary”: installed power, subscription, residual current devices.
  • Rooms against the minimums of the profile: sockets and lighting points placed and minimum, detectors. The line is marked “Meets the profile” or “Below the minimum”: a comparison with the profile, with no value as a certificate.
  • Circuits: rating, cross-section, connected points, “Estimated cable length”, longest run and estimated voltage drop against its limit. Ratings, cross-sections and distribution per residual current device come from the SchémaConcept profiles; only the France profiles provide them.
  • “Correspondences”: each point, the reference designator of the component in the schematic and its product.
  • “Checks and differences”, then the latest operations of the log.
  • Buttons “Report (PDF)” and “Correspondences (CSV)” (semicolon separator, readable in a spreadsheet). With the layout plan in SVG or PDF and the JSON export of a standards profile, these are the five files the bridge produces.
  • Statement carried by the report: indicative checks, the module certifies nothing; a qualified electrician validates the installation.

17. The “Log” tab

The trace of everything done on the link.

  • Each operation is traced: date, user, action, “Direction”, “Counters”, result.
  • Traced actions: creation, modification, archiving, reactivation, deletion, application in SchémaConcept, application in Concept3D, quote merge, gap resolved.
  • Results: “Succeeded”, “No effect”, “Failed”; three indicators total the operations.
  • The last 500 operations are displayed, most recent first; the log is kept when the link is deleted.

18. Standards profiles by country

Installation rules follow the country of the job.

  • Nine delivered profiles: France NF C 15-100 (2015 and 2024), Belgium, Switzerland, Germany, Spain, Italy, United Kingdom and a generic IEC profile.
  • “Country standards” screen: list of the profiles and their status (“Reference to validate”, “Validated”, “Custom”), indicators, enabling or disabling a profile, “Default profile per country”, “Import a profile” (JSON file).
  • Card of a profile, by tabs: “General”, “Heights”, “Kitchen”, “Bathroom”, “Rooms”, “Sources”. Each value carries its confidence level (“Read in the standard”, “Cross-checked”, “To check”, “Not filled in”) and its sources.
  • A value that is not filled in triggers no check; it is counted in “Rules not filled in”.
  • A delivered profile cannot be edited: use “Copy as custom profile”, then edit the values of the copy. “Export (JSON)” and the import let you pass it on.
  • “Validation by a professional”: the Dolibarr administrator records the date and the name of the validator; any change of value removes the validation. A personal profile used by a link cannot be deleted.
  • Profile of a link: the one set on the link, otherwise the default profile of the third party's country, otherwise the generic profile. The electrical part (circuits, residual current devices, cross-sections) is read in SchémaConcept under the same profile code.
  • The profiles are sizing aids, built from cross-checked secondary sources: they must be validated by a qualified professional. The module certifies no compliance.

19. Setup

Tabs to adapt the bridge to the way you work.

  • Reached through “Setup” in the bridge menus or through the list of modules. Tabs: “Settings”, “Country standards”, “Mappings”, “Optics”, “Catalogue and families”, “Companion modules”, “About”.
  • “Settings”: state of the two linked modules (absent, installed but disabled, version too old, ready) and detected entry points, synchronisation mode, “Link reference prefix”.
  • “Mappings”: what each object of the plan calls for as an electrical point. The search goes in this order: product, product category, drawn equipment, appliance, cabinet type, 3D model category. For each line: symbol, circuit, power, height, active or not. 62 mappings are delivered; they are editable suggestions.
  • “Room rules”, in the same tab: RJ45 and TV sockets, switch per door, alarm detector and smoke detector, by room type.
  • “Optics”: angle (1 to 360°) and range (0.5 to 100 m) of motion detectors and cameras, by symbol or for a given product.
  • “Companion modules”: state of Concept3D and SchémaConcept, required for writing, and of two modules for timestamped and archived electronic signature, announced as planned for the quotes produced from a link.
  • “About”: reminder of the role of the module and of the indicative scope of its checks.

20. “Catalogue and families”: your products recognised

A screen shared by Concept3D, SchémaConcept and the bridge.

  • It classifies your existing products into 24 families (sockets, lighting, network, alarm, fire, home automation, furniture…).
  • Families: take over an existing product category, without changing it, or let the module create the category of the family.
  • Detection: a classification is suggested from the reference, the label and the description of each product, with keywords in five languages; you validate line by line.
  • Each validation forms a logged batch, which you can undo.
  • A product classified in a family is then recognised by the plan analysis and can be placed in the plan, with no product-by-product setting.
  • The Categories module and the permission to create categories are required.

21. Safeguards

What the bridge prevents, and what it does not claim to do.

  • A plan, a schematic or a third party carried by an active link cannot be deleted; a project cannot be deleted from its card.
  • Once the link is archived, deletion becomes possible again and the reference is removed from the link.
  • A deleted quote is simply forgotten by the link.
  • Every write goes through a form protected by the Dolibarr security token; so do the downloads.
  • The checks of the bridge are indicative: an electrical installation is designed and validated by a qualified professional.

22. Getting the module and help

Everything goes through the KSIDol shop.

  • Buy the Bridge Concept3D / SchémaConcept in the shop: https://www.ksidol.io
  • Concept3D and SchémaConcept are bought separately in the same shop.
  • Pre-sales questions and support: https://www.ksidol.io/contact
  • GPL v3 licence.

23. Links with Dolibarr

The module does not work in isolation: it integrates with the native building blocks of Dolibarr.

  • Third parties : a link carries the third party of the plan or the schematic; its country selects the suggested standards profile. A third party carried by an active link cannot be deleted.
  • Projects : the link takes the project of the plan or the schematic; merged quotes are filed in it, and a project is created on merge if there is none.
  • Proposals : the layout and electrical quotes are found through their native links; the merged quote is an ordinary Dolibarr proposal, linked to the link.
  • Products and categories : the classification into families relies on native product categories; optics can be set for a given product.
  • Linked objects : the link, the plan and the schematic appear in each other's linked objects blocks.
  • Concept3D : the bridge reads the plan (rooms, walls, openings, placed objects) and places equipment in it through Concept3D functions.
  • SchémaConcept : the schematic, the board, the single-line diagram and the installation sheet are created through SchémaConcept functions, which also calculates the circuits and the power balance.
  • Permissions : five permissions of the bridge, combined with those of the target modules; external accounts have no access to any screen.
  • Multicompany : links, profiles, mappings and optics stay in their entity.
Need help? WhatsApp Phone: 07 45 15 75 87 Phone: 07 43 52 58 29 Email Open the form